| SG158 transets |
Based on high voltage useage over previous 2 dives:
dives remaining : -229 (-3.2 days at current dive duration)
projected end date: 01-Feb-2013 15:00:54 (to 5% capacity)
|
|
|
|
|
|
| dive | end time (UT) |
length (min) |
depth (meters) |
lat | lon | dog (km) |
cog | dtw (km) |
ctw | dtg (km) |
ctg | Umag (cm/s) |
Udir | dive | climb | high V | low V | errors | retries | ||||||||||||||
| pitch | rollL | rollR | pitch | rollL | rollR | volts | kJ | % cap | volts | kJ | % cap | TT8 | CF8 | pit | rol | VBD | pit | rol | VBD | ||||||||||||||
| 2 l c | 13/04/19 19:37 | 20 | 45.20(45.00) | 44 33.45 | -123 17.04 | 0.00 | 199.6 | 0.00 | 17.2 | 86.4 | 277.3 | 1.0 | 0.20 | -12.9 | 1 | 0 | 20.0 | 0 | 1 | 24.6 | 3.0 | 99.1 | 10.3 | 1.0 | 97.8 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 751 l c | 13/02/04 19:38 | 21 | 45.50(45.00) | 44 33.45 | -123 17.04 | 0.01 | 289.3 | 0.00 | 17.2 | 86.4 | 277.3 | 1.3 | 193.40 | -18.9 | 0 | 1 | 20.0 | 1 | 0 | 20.5 | 3.0 | 100.0 | 8.9 | 0.0 | 100.0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |